< Matrix >
Many of these are tasks and actions you already perform. These guidelines place them in a sustainability framework. These guidelines are synchronized with the Ports Checklist that has been developed over the past few years as we have grown PB's sustainability approach to work. This checklist is available above.
Select a link in the matrix below to navigate to information you are looking for, or a topic you are interested in.
What Project Phase are you in? |
|||||||
|---|---|---|---|---|---|---|---|
| What to do |
CRM |
RFQ / RFP |
Feasibility Studies / Corridor Selection |
Conceptual Design |
Final Design |
Construction |
Operations / Maintenance |
| Client Relations / Pursuit Manager |
Identify Client Sustainability Policy Discuss Potential for Sustainable Design Integration into Client's Agency |
Identify Sustainable Design Requirements in RFQ/RFP Emphasize PB's Sustainable Design Capabilities in Qualifications / Proposal / Interview |
|||||
| Project Manager |
Consider Sustainable Design Requirements when Staffing Project |
Ensure Adherence to Sustainability Goals & Objectives |
Ensure Adherence to Sustainability Goals & Objectives |
Ensure Adherence to Sustainability Goals & Objectives |
|||
| Planner |
Sustainable Design Principles for Location Selection |
||||||
| Civil Engineer |
Context Sensitive Design Transit Access and Other Non-Motorized Travel Options Building-Based/Campus-Based Stormwater Management (Quality & Quantity)
|
Context Sensitive Design Accessibility Considerations Building-Based/Campus-Based Stormwater Management (Quality & Quantity) |
Sediment & Erosion Control Plans Maintenance of Non-Vehicular Traffic |
||||
| Structural Engineer |
Structure Aesthetics Context Sensitive Design |
Structure Aesthetics |
|||||
| Utility / Lighting Designer |
Consolidation of Multiple Utilities into "Utilidors" Alternative Lighting Solutions |
Consideration of Future Access to and Capacity of Utilities |
Minimization of Impacts to Existing Utilities Temporary Lighting and Utility Connections |
||||
| Landscape Architect |
|
||||||
| Cost Estimator |
Sustainable Cost-Benefit Analysis
|
Cost Impacts of Sustainable Design Elements |
Cost Impacts of Sustainable Design Elements |
Cost Impacts of Sustainable Design Elements |
|||
| Construction Manager |
Minimization of Impacts Due to Construction Activities Adherence to Client's Small & Disadvantaged Business Policies |
||||||